Battery Manufacturing Equipment
EQUIPMENT • WINDING & STACKING

Geesun GSSF electrode/separator composite stacking machine

The Geesun GSSF takes electrode rolls with tabs already cut, cuts the electrode pieces, laminates them with separator and drop-stacks them into cores, followed by hot pressing and wrap taping. The table lists 8–35 mm core thickness, 250–600 mm length, CCD positioning, 480–800 ppm and 0.125 s/piece per table. It suits long stacked cores.

By Shenzhen Geesun Intelligent Technology · GSSF

BatteryEquip editorial teamSource review: 2026-10-11Buying guide based on the maker's published data.
PUBLISHED REFERENCE

Core size, stacking accuracy and the three rate figures

Geesun lists core thickness 8–35 mm,80–150 mm width and 250–600 mm length, with CCD positioning and stacking accuracy of±0.3 to±0.5 mm. The table gives a working efficiency of 480–800 ppm and an auxiliary time of 0 seconds. The introduction adds 0.125 s/piece per stacking table and up to 1 GWh a year per machine. Ask what one piece in the ppm row is, how many tables are fitted, the layer count, the discharge steps and the operating calendar behind the annual figure.

A0.125-second cycle equals 480 cycles a minute, yet the page does not say whether each cycle is one electrode, one composite unit or one finished core. Annual energy capacity also depends on your cell design and working hours. Ask the supplier for one consistent capacity calculation built on your drawing, and check it in a timed run.

Original parameter values · 5 entries
ParameterPublished valueRecord status
Published core thickness8–35 mmknown
Published core width80–150 mmknown
Published core length250–600 mmknown
Claimed stacking accuracy±0.3 to±0.5 mmknown
Published efficiency, counting basis to confirm480–800 ppmknown

Catalogue values apply to the configuration and test method the maker states. Ask for the values that apply to your configuration.

Source references: s1

BUYER NOTES

The laminated electrode-separator structure

This route differs from a stacker fed with loose cut sheets or a standard separatorZ-fold. Send the electrode coating and separator materials, the tab-cut roll geometry, the composite structure you want and the full layer schedule. Ask for the method and settings for laminating the separator, cutting the electrode, stacking, hot pressing and taping. The page describes the sequence and gives no bonding or temperature figures.

Geesun describes wrinkle-free separator, flat core interfaces and suitability for semi-solid and solid-state cells. Ask which separators, electrolyte systems and solid-state designs it has run, and trial your own. Agree checks for wrinkles, layer position, interfaces and material damage on representative material with a set sampling plan. Define the CCD reference point and what happens when it finds a defect.

Source references: s1 s2

BUYER NOTES

Timing good cores in the acceptance run

The factory-acceptance recipe should state the layer count, core design, material rolls, number of stacking tables and every finishing step included. Log elapsed time, good finished cores, rejects and stoppages. Ask Geesun to explain the 0-second auxiliary-time row, especially for finishing, discharge, reloading and changeover, and time those steps during the run.

Watch a stop and restart and the supplier's recovery of a part-built stack, including tracking and rejection if it cannot be finished. At handover, collect the installed process and inspection list, calibration references, cutting consumables, guards and extraction, heating and utility needs, and recipe backups. Case assembly, filling, formation and cell release are later steps on other equipment. Use the good-core rate from the run in your capacity plan.

Source references: s1

MAKE A SELECTION

Questions that change the purchase

DecisionWhat the catalogue saysNext step
What do the three output claims count?The catalogue gives 0.125 s/piece,480–800 ppm and 1 GWh/year without stating the unit counted.Get a calculation by layers, tables, finishing and hours, then time good cores.
Is the composite process qualified for this material?The catalogue mentions semi-solid and solid-state suitability without a recipe.Trial your electrode and separator structure and inspect the interfaces.
What happens to a partly stacked core?The table lists 0 seconds auxiliary time and no recovery procedure.Agree how stopped material is handled and watch a traceable recovery.
FROM READING TO A BRIEF

Prepare the supplier conversation

Fill in the conditions below and ask the supplier to answer each open point in writing. Copying or downloading stays in your browser; nothing is sent.

Prepare a full project brief →

SOURCES

Sources and check dates

The maker's own pages and public records used for this page, each with the date it was checked.

s1 · Geesun GSSF electrode/separator composite stacking machine original rendered equipment description

Geesun · Manufacturer-origin source

Gives GSSF core sizes, stacking accuracy, CCD positioning, rate, auxiliary time and annual capacity figures.

Archived source check: 2026-10-11

s2 · Official process-specific equipment catalogue

Geesun · Manufacturer-origin source

Describes Geesun's composite stacking sequence with hot pressing and wrap taping.

Archived source check: 2026-10-11

Still to confirm

  • What one piece means in the 480–800 ppm row, and the basis for 1 GWh a year.
  • The real time taken by finishing, discharge, reloading and changeover.
  • Laminating and hot-pressing settings for your electrode and separator.
  • Which semi-solid or solid-state designs the machine has already run.
BEFORE YOU REQUEST A QUOTE

Composite electrode-separator stacking of long cell cores

  1. Core size, tab-cut rolls and layer schedule
  2. Electrode-separator composite structure and pressing and heating settings
  3. CCD reference, stacking tolerance and wrinkle and interface limits
  4. Piece versus core counting, tables and annual capacity basis
  5. Finishing, discharge, changeover and part-built stack handling
  6. Inspection and reject coverage, consumables, utilities and safety
Edit your enquiryRead the manufacturer dossier →
Analytics preferences

Usage analytics loads only with your consent. Private pages are excluded. Inquiry text and contact details are not sent to analytics.

Analytics has not been allowed.