Battery Manufacturing Equipment
EQUIPMENT • WINDING & STACKING

Gelon lithium-sulfur Z-fold CCD stacking machine

Gelon's lithium-sulfur stacker is a desktop-frame Z-fold machine. A motor shuttles the separator left and right under automatic constant tension while a CCD checks and positions each sheet. Gelon lists 3–5 seconds per piece on one station, 20–30 seconds of ancillary time and ±0.3 mm adjacent alignment. It serves lithium-sulfur pouch cell development and pilot lines.

By Gelon Lib Group Co., Ltd.

BatteryEquip editorial teamSource review: 2026-10-11Buying guide based on the maker's published data.
PUBLISHED REFERENCE

Separator motion, tension and CCD

The machine sits on a desktop frame. A motor drives the separator left and right to form the Z fold, and the separator roll runs under automatic constant tension. A CCD handles defect detection and positioning. Gelon names lithium-sulfur cells as the use but lists no electrode size, separator build, layer count or handling setup.

The catalogue gives electrode to separator centre deviation of ±0.5 mm, separator end-to-face accuracy of ±0.5 mm, adjacent electrode alignment of ±0.3 mm and overall electrode alignment of ±0.5 mm. Each refers to a different feature, so ask for a marked inspection drawing and an explanation of the separator end-to-face term.

Original parameter values · 4 entries
ParameterPublished valueRecord status
Published single-station cycle; piece undefined3–5 s/pieceknown
Listed ancillary time20–30 sknown
Stated adjacent-electrode alignment±0.3 mmknown
Stated overall electrode alignment±0.5 mmknown

Catalogue values apply to the configuration and test method the maker states. Ask for the values that apply to your configuration.

Source references: s1

BUYER NOTES

Adding up piece time and ancillary time

Single-station stacking runs at 3.0–5 seconds per piece, and ancillary time is 20–30 seconds. The catalogue does not say whether a piece is one sheet, another transfer step or a whole stack. Ask the supplier to lay out the timing for your build, with layer count, separator cut and unloading included, before you estimate cells per hour.

Agree the output and availability basis for your electrode and separator. Count loading, inspection rejects and ancillary steps during a witnessed run. Gelon publishes no yield or output on lithium-sulfur material, so settle the counting basis in writing first.

Source references: s1

BUYER NOTES

Detection and handling on your material

The CCD is listed without defect classes, optical limits or a reject route. Bring samples of the faults you need caught and find out which ones the system sees. Polarity order and separator coverage on every layer need their own checks besides positioning.

Send collector and separator properties, the overhang and the stack thickness you need. Ask Gelon to show pickup, holding and stack removal with no unacceptable deformation or sticking. Set lithium-metal handling conditions from your own process. Inspect the stack after unloading and after a controlled stop, when holding and registration can differ from steady running.

The stacked cells move on to the Gelon lithium-sulfur tab joining line.

Source references: s1

MAKE A SELECTION

Questions that change the purchase

DecisionWhat the catalogue saysNext step
What is a piece in the cycle statement?The page lists 3–5 s/piece and 20–30 s ancillary time with no build definition.Map every timed step to your layer count.
Which alignment datum controls the finished stack?The page lists adjacent, overall and separator-related figures.Approve a marked inspection drawing and measure after unloading.
Can the CCD see the relevant defects?The page lists CCD detection without defect classes.Test known defect samples and confirm the reject response.
FROM READING TO A BRIEF

Prepare the supplier conversation

Fill in the conditions below and ask the supplier to answer each open point in writing. Copying or downloading stays in your browser; nothing is sent.

Prepare a full project brief →

SOURCES

Sources and check dates

The maker's own pages and public records used for this page, each with the date it was checked.

s1 · Gelon lithium-sulfur Z-fold CCD stacking machine — manufacturer equipment page

Gelon · Manufacturer-origin source

Gelon's product page with the separator drive, tension and CCD functions, alignment figures and cycle times.

Archived source check: 2026-10-11

s2 · Gelon official equipment portfolio

Gelon · Manufacturer-origin source

Gelon's equipment range, including the lithium anode die cutter and tab joining line for the same cells.

Archived source check: 2026-10-11

Still to confirm

  • Electrode size range, separator type and maximum layer count.
  • What one piece means in 3–5 s/piece, and the full stack time at your layer count.
  • Which defects the CCD detects and how rejects are handled.
  • Finished stack alignment on your lithium-sulfur materials after unloading.
BEFORE YOU REQUEST A QUOTE

CCD-guided Z-fold stacking for lithium-sulfur pouch cells

  1. Electrode/collector, separator and lithium-sulfur stack drawing
  2. Layer count, separator overhang and final stack thickness
  3. CCD defect classes, positioning datums and test samples
  4. Definition of piece cycle and ancillary operations
  5. Pickup, retention, unloading and interruption acceptance
  6. Validated handling environment and finished-stack records
Edit your enquiryRead the manufacturer dossier →
Analytics preferences

Usage analytics loads only with your consent. Private pages are excluded. Inquiry text and contact details are not sent to analytics.

Analytics has not been allowed.