Dose range, fixture and size

TOB lists a capacity of 0.2–200 mL and ±0.5% injection accuracy. The same table gives core liquid injection as 0.2–200 g; grams and millilitres only match once you fix the liquid's density and the dosing method. Ask which quantity is set, which is measured and what the percentage refers to.

For cylindrical cells TOB lists up to 60 mm diameter and 100 mm height, with four positions counted on an 18650 basis. Larger cells may give fewer positions. Delivery is adjustable to 6 mL/s and the X-axis stroke runs 0–80 mm. The station measures 400 × 260 × 500 mm, weighs 70 kg and runs on 220 V/50 Hz at 0.5 kW.

Original parameter values · 6 entries
ParameterPublished valueRecord status
Published capacity range0.2–200 mLknown
Catalogue injection accuracy±0.5 %known
Listed delivery rate, adjustable6 mL/sknown
Cylindrical envelope, catalogueDiameter ≤60; height ≤100 mmknown
External dimensions400 × 260 × 500 mmknown
Listed mass70 kgknown

Catalogue values apply to the configuration and test method the maker states. Ask for the values that apply to your configuration.

Source references: s1

BUYER NOTES

Fixtures and the dry environment

Send the cell case, fill opening and handling drawing, including any temporary seal or connector used during soaking. Ask which cylindrical or pouch fixtures are supplied and how many cells each one takes in your configuration. TOB names both cell types; get the full tooling list in writing.

For glovebox use, check the station weight, entry size, service access and where the pump and exhaust sit. For dry-room use, state the moisture specification and the exposure time allowed. TOB mentions chemical-resistant hoses and 304 and 316 stainless steel in key parts; ask for the complete wetted-material list for your electrolyte.

Source references: s1

BUYER NOTES

Check the dose first, then the soak

Trial repeatability at low, typical and high doses with your electrolyte or an agreed substitute. Include priming, idle time and nozzle carryover. Set the balance or other reference used for the dose held in the cell, and record liquid delivered and liquid left in the cell after the full sequence as separate figures.

Ask for pressure, dwell and venting logs for the vacuum soak. Agree a wetting check with your cell team, along with leak, overflow and fixture cleaning checks for acceptance. TOB gives no vacuum range for this model and no wetting result, so both come from your trial.

TOB's profile lists the drying ovens and sealers used around this station, and filling is one step in the cell assembly sequence. The first charge after sealing is covered on the page on formation and grading.

Buying guidance from BatteryEquip.

MAKE A SELECTION

Questions that change the purchase

DecisionWhat the catalogue saysNext step
Is the dose a mass or a volume?The catalogue lists both 0.2–200 mL and 0.2–200 g.Confirm the metering method, density basis and error reference at each dose.
How many of your cells fit the fixture?The catalogue gives four positions on an 18650 basis.Get fixture drawings for your cell and the number of positions.
How will you judge the soak?The catalogue combines filling and diffusion but gives no pressure, dwell or wetting data.Agree the vacuum sequence and a separate wetting or retention check.
CLEAR UP THE DETAIL

Equipment questions

Does ±0.5% hold across the whole range?

TOB gives no dose-by-dose accuracy data and does not say what the percentage refers to. Ask for test conditions and repeatability at your actual setpoints, especially the smallest dose, and settle the grams versus millilitres question before writing the figure into a contract.

Source s1
FROM READING TO A BRIEF

Prepare the supplier conversation

Fill in the conditions below and ask the supplier to answer each open point in writing. Copying or downloading stays in your browser; nothing is sent.

Prepare a full project brief →

SOURCES

Sources and check dates

The maker's own pages and public records used for this page, each with the date it was checked.

s1 · ZY65 electrolyte filling and vacuum diffusion station — original equipment page

TOB · Manufacturer-origin source

TOB's product page for the ZY65, with dose ranges, accuracy, cell size limits, positions, flow, stroke, size and power.

Archived source check: 2026-10-11

s2 · TOB manufacturer equipment catalogue

TOB · Manufacturer-origin source

TOB's equipment catalogue, listing this station with its other filling machines.

Archived source check: 2026-10-11

Still to confirm

  • Whether the dose is set by mass or volume, and what ±0.5% refers to.
  • The vacuum range used for diffusion.
  • The fixtures supplied and how many of your cells each holds.
  • Wetting results on your electrode stack.
  • The full wetted-material list for your electrolyte.
BEFORE YOU REQUEST A QUOTE

Electrolyte dosing and vacuum soaking for lab cells

  1. Cell and fill-port drawing, fixture capacity
  2. Electrolyte density, viscosity and material compatibility
  3. Dose setpoints, error basis and repeatability method
  4. Vacuum, dwell and vent sequence, dose-in-cell checks
  5. Glovebox or dry-room setup, exhaust and cleaning
Edit your enquiryRead the manufacturer dossier →
Analytics preferences

Usage analytics loads only with your consent. Private pages are excluded. Inquiry text and contact details are not sent to analytics.

Analytics has not been allowed.