Hangke small steel-case negative-pressure formation/grading system

Hangke's small steel-case line runs automatic negative-pressure formation and grading. Cells arrive in sealed transport boxes and are loaded, scanned and positioned by vision, moved by robot into formation, then sorted automatically. Hangke lists at least 6 ppm. It suits small steel-case cells, with cell sizes, vacuum recipe and cycle time agreed per project.

By Zhejiang Hangke Technology Incorporated Company

BatteryEquip editorial teamSource review: 2026-10-11Buying guide based on the maker's published data.
PUBLISHED REFERENCE

Sealed boxes, stations and what the page leaves out

Hangke lists a full automatic sequence, without the number of boxes, cells per box, contact geometry, installed channels or transfer and environment conditions. Small steel case describes the application; ask which cylindrical sizes the line takes. Request the cell and box drawings and the supplier's station and interface list.

Ask where negative pressure is applied: at the cell connection, in a process enclosure or elsewhere. The page does not say, and gives no pressure or time limits. Ask for this line's own electrical and mechanical configuration, since Hangke's prismatic formation stations have different voltages, trays and temperature figures.

Original parameter values · 1 entries
ParameterPublished valueRecord status
Stated output lower bound≥6 ppmknown

Catalogue values apply to the configuration and test method the maker states. Ask for the values that apply to your configuration.

Source references: s1

BUYER NOTES

Box barcodes, cell positions and vision

Define the box ID, cell positions, scanned values and the data passed on when the robot picks a cell. Hangke names vision positioning without its accuracy or the faults it detects. Ask how empty slots, shifted cells, an unreadable box and a failed pick are caught.

Run representative box loads and an agreed misplaced-cell case using the supplier's safe procedures. Check that the physical cells match the formation contacts and the sorting destinations downstream. If boxes are sealed for transport, specify how they are opened and closed again, and when an unfinished transfer is held back.

Source references: s1 s2

BUYER NOTES

Formation recipe, sorting rules and acceptance

Agree the charge, discharge, rest and temperature conditions, voltage and current limits, and the result used for capacity grading or sorting. The summary gives none of these settings or their measurement accuracy. Ask how incomplete tests, retests and recipe changes are kept in the result record.

If ≥6 ppm is a requirement, count good cells over the full installed sequence and log cycle time, box loading, rejects and stoppages. At handover, cover box and fixture maintenance, robot and energy isolation, and controlled recovery for cells between stations. Ask Hangke to state its finished-cell rate for your recipe and any seal or environment test it applies to the boxes.

Data from the line should be accepted with an independent meter, as the page on factory and site acceptance explains.

Source references: s1

MAKE A SELECTION

Questions that change the purchase

DecisionWhat the catalogue saysNext step
Where is negative pressure applied?The page names negative-pressure formation without the vacuum boundary.Specify connection or enclosure drawings and the pressure-time recipe.
How does box identity follow individual cells?The page lists scanning and vision without a cell mapping.Check box loading, picking and downstream positions in a trial.
What completes a formation/sorting decision?The page gives no electrical settings or grade rules.Fix the recipe, complete-result rule and retest ownership.
FROM READING TO A BRIEF

Prepare the supplier conversation

Fill in the conditions below and ask the supplier to answer each open point in writing. Copying or downloading stays in your browser; nothing is sent.

Prepare a full project brief →

SOURCES

Sources and check dates

The maker's own pages and public records used for this page, each with the date it was checked.

s1 · Hangke small steel-case negative-pressure formation/grading system original public data

Hangke Technology · Manufacturer-origin source

Describes the box-fed sequence, scanning, vision, robot transfer, sorting and the ≥6 ppm rate.

Archived source check: 2026-10-11

s2 · Hangke original post-processing equipment portfolio

Hangke Technology · Manufacturer-origin source

Shows the steel-case line among Hangke's formation systems.

Archived source check: 2026-10-11

Still to confirm

  • The steel-case cell sizes the line handles and the cells per box.
  • Where negative pressure is applied, and the pressure and time recipe.
  • Channel configuration, electrical ratings and measurement accuracy.
  • Which steps are counted in the ≥6 ppm figure.
  • Whether the sealed boxes are tested for environment or leaks.
BEFORE YOU REQUEST A QUOTE

Box-fed negative-pressure formation and sorting of small steel-case cells

  1. Steel-case cell sizes and box position map
  2. Negative-pressure boundary, services and sequence
  3. Robot and vision checks, part-filled boxes and transfers
  4. Electrical and temperature recipe and grading criteria
  5. ≥6 ppm full-cycle conditions and good output
  6. Sealed-box maintenance, energy isolation and recovery