Battery Manufacturing Equipment
EQUIPMENT • FORMATION & TESTING

Hangke 46XX cylindrical-cell DCIR test station

Hangke's 46XX DCIR station measures the direct-current internal resistance of large cylindrical cells. It combines handling, a discharge system, heat dissipation, an industrial computer and safety modules, and comes with 64,144,196 or 256 channels. Results are stored and uploaded to a server. It suits post-formation screening of 46XX cells.

By Zhejiang Hangke Technology Incorporated Company

BatteryEquip editorial teamSource review: 2026-10-11Buying guide based on the maker's published data.
PUBLISHED REFERENCE

Discharge system, channel options and test functions

Hangke describes online testing, automatic scanning and location, several error-correction measures and high-precision testing. It does not list which corrections run or give a numeric uncertainty. The channel options belong to one station family. Ask Hangke to state in the quotation the installed layout, how many channels run current at the same time and the hardware specification, and to give a good-cell rate.

This station has its own discharge system for DCIR testing, which an OCV/IR station lacks. Specify the pulse current, pulse length, voltage sampling points and rest condition you need, because the page gives none of them. Compare bids on the same DCIR method; ACIR values, static resistance numbers and formation-machine current ratings measure different things.

Original parameter values · 1 entries
ParameterPublished valueRecord status
Channel configurations64 /144 /196 /256 CHknown

Catalogue values apply to the configuration and test method the maker states. Ask for the values that apply to your configuration.

Source references: s1

BUYER NOTES

Cell condition, contacts and repeat measurements

Set the state of charge, temperature and rest before any comparison of results. Ask for the sensing and contact design, the fixture force or travel and how the station catches poor or shifted contacts. Hangke mentions automatic positioning but gives no contact dimensions or contact resistance. The fixture must fit your 46XX terminal drawing and tolerances.

Ask for repeat measurements on representative cells under the agreed conditions, with calibrated electrical references and a written uncertainty budget. Agree how a doubtful contact is flagged and whether the cell is retested or rejected. Check agreement between channels and across the temperature range you will run, as well as repeatability at one contact position.

Source references: s1 s2

BUYER NOTES

Keeping each result linked to its cell

Hangke describes test records and upload to a server. Specify what each record holds: cell, tray and channel IDs, pulse settings, sampled values, the calculated DCIR, and the calibration and recipe version. Decide which system owns the limits, how repeat tests are marked and what happens when an upload fails. Plan a live test of the connection to your own database.

Agree where the reject decision is carried out: this station measures DCIR, and anNG handler or grading machine moves the cell. Using Hangke's safe procedures, try a swapped cell, an unreadable ID and a lost connection, and check that an incomplete or mismatched result never releases the wrong cell. At handover, collect the cooling and heat-rejection needs, contact spares, calibration schedule, electrical isolation and recovery steps for cells left in test positions.

Source references: s1

MAKE A SELECTION

Questions that change the purchase

DecisionWhat the catalogue saysNext step
Which DCIR pulse and rest conditions are required?The page gives no pulse current, timing or sampling points.Fix the recipe and test conditions before comparing resistance results.
How does the fixture handle contact error?The page lists automatic positioning and error correction without method details.Trial your terminal drawing and watch a poor-contact decision.
Where is the final reject decision executed?The page lists records and server upload but no sorting function.Specify who owns results, how IDs pass on and how incomplete data is handled.
FROM READING TO A BRIEF

Prepare the supplier conversation

Fill in the conditions below and ask the supplier to answer each open point in writing. Copying or downloading stays in your browser; nothing is sent.

Prepare a full project brief →

SOURCES

Sources and check dates

The maker's own pages and public records used for this page, each with the date it was checked.

s1 · Hangke 46XX cylindrical-cell DCIR test station original public data

Hangke Technology · Manufacturer-origin source

Describes the 46XX DCIR station's modules, channel options, test functions and data upload.

Archived source check: 2026-10-11

s2 · Hangke original post-processing equipment portfolio

Hangke Technology · Manufacturer-origin source

Shows the DCIR station among Hangke's formation, grading and test equipment.

Archived source check: 2026-10-11

Still to confirm

  • The DCIR current range and pulse recipe the station can run.
  • Resistance measurement uncertainty and contact specifications.
  • Good-cell rate for the channel layout you order.
  • What is included for connecting results to your server.
BEFORE YOU REQUEST A QUOTE

DCIR testing of 46XX cylindrical cells with server records

  1. 46XX terminal drawing and installed channel layout
  2. Pulse current and length, sampling windows, rest and SOC
  3. Cell temperature and repeat-measurement limits
  4. Sensing and contact design, calibration and contact-fault handling
  5. Heat rejection, parallel channels and utility limits
  6. Record format, server outage handling and reject interface
Edit your enquiryRead the manufacturer dossier →
Analytics preferences

Usage analytics loads only with your consent. Private pages are excluded. Inquiry text and contact details are not sent to analytics.

Analytics has not been allowed.