Gelon's automatic line finishes pouch cells after formation. It degasses and seals, cuts, folds and irons the edges, then runs a short-circuit test, weighing, size measurement, taping and OCV sorting. Gelon lists 15 ppm. It suits production pouch lines that want gas removal and final screening in one run, once the capacity figure is restated.

By Gelon Lib Group Co., Ltd.

BatteryEquip editorial teamSource review: 2026-10-11Buying guide based on the maker's published data.
PUBLISHED REFERENCE

Degassing plus finishing and checks

Gelon lists automatic degassing and sealing, edge cutting, folding and ironing, short-circuit testing, weighing, size measurement, taping and OCV sorting. So the line covers finishing and screening as well as gas removal. Pouch size range, vacuum level, sealing temperature and force, residual gas limit and leak test method are not given.

Ask Gelon what one unit of the 15 ppm rate is and which station sets the pace. The annual capacity entry reads 1 GW, which is a power unit; ask for a corrected annual output in energy terms, built from cell capacity, operating hours, yield and the real station cycle, before using it in a factory plan.

Original parameter values · 2 entries
ParameterPublished valueRecord status
Published line rate; basis to confirm15 ppmknown
Listed final electrical screeningOCV sorting and short-circuit test known

Catalogue values apply to the configuration and test method the maker states. Ask for the values that apply to your configuration.

Source references: s1

BUYER NOTES

Gas pocket and final seal

Send the pouch and gas pocket drawing, the cell state, the electrolyte system and how the cell may be oriented. Degassing releases gas and some electrolyte, so ask how the line opens the pocket, collects material, prevents contamination and leaves room for the final seal. These belong in Gelon's written scope.

Agree the seal position and the pouch shape left after cutting and folding. Name the inspection and sampling that prove seal integrity. If you need a leak test, say which method and which station runs it; the short, weight and size checks each answer a different question.

Source references: s1

BUYER NOTES

Edge finishing and electrical sorting

Ironing, folding and taping should give the edge you specify without harming the seal or the tab area. Send bend, edge and tape requirements with the drawing and inspect cells after the whole sequence. Ask for cleaning access and reject recovery around the trimming stations. Gelon lists no size tolerance or particle limit.

OCV sorting checks voltage only; capacity and cycle life are tested elsewhere. Define rest time, temperature, voltage limits and cell identity so the OCV comparison means something. Weighing also needs a reference and a resolution suited to the decision. In the acceptance run, record every check result and confirm a failed cell cannot rejoin the good flow.

Source references: s1

MAKE A SELECTION

Questions that change the purchase

DecisionWhat the catalogue saysNext step
What does the 15 ppm rate count?The page gives 15 ppm with no cell size or counting basis.Agree the full finishing setup and sustained good-cell output.
Can the annual-capacity figure be used?The page writes 1 GW for annual capacity.Get a corrected annual production statement with its assumptions.
Do the listed checks prove a sealed cell?The page lists OCV, weight, size and short tests and no leak test.Define seal integrity and leak acceptance alongside sorting.
FROM READING TO A BRIEF

Prepare the supplier conversation

Fill in the conditions below and ask the supplier to answer each open point in writing. Copying or downloading stays in your browser; nothing is sent.

Prepare a full project brief →

SOURCES

Sources and check dates

The maker's own pages and public records used for this page, each with the date it was checked.

s1 · Gelon automatic pouch degassing, sealing and finishing line — manufacturer equipment page

Gelon · Manufacturer-origin source

Gelon's product page listing each degassing, finishing and checking step, the 15 ppm rate and the annual capacity entry.

Archived source check: 2026-10-11

s2 · Gelon official equipment portfolio

Gelon · Manufacturer-origin source

Gelon's equipment range, including pouch filling and pre-sealing machines used before formation.

Archived source check: 2026-10-11

Still to confirm

  • What one unit of the 15 ppm rate is and which station limits it.
  • A corrected annual output in place of the 1 GW entry, with the assumptions behind it.
  • Vacuum level, sealing temperature and force, and the pouch size range.
  • Whether a leak test is included and which method it uses.
BEFORE YOU REQUEST A QUOTE

Post-formation degassing, edge finishing and OCV sorting of pouch cells

  1. Pouch and gas-pocket drawing, incoming cell state and electrolyte
  2. Degassing method, vacuum reference and electrolyte collection
  3. Seal, cut, fold, ironing and tape geometry
  4. Leak inspection and seal-integrity acceptance
  5. OCV rest time, temperature, weighing and dimension thresholds
  6. 15 ppm counting basis, reject flow and corrected annual capacity
Edit your enquiryRead the manufacturer dossier →
Analytics preferences

Usage analytics loads only with your consent. Private pages are excluded. Inquiry text and contact details are not sent to analytics.

Analytics has not been allowed.