The DC-300V from Dianzhonghe runs a set electrical inspection on an assembled battery pack after an operator connects it. It charges across 0–300 V and discharges across 20–300 V, records results to CSV, and offers BMS and MES links as options.

By Shenzhen Dianzhonghe New Energy Equipment Co., Ltd. · DC-300V

BatteryEquip editorial teamSource review: 2026-10-11Buying guide based on the maker's published data.
PUBLISHED REFERENCE

Manual connection, then an automatic test

Dianzhonghe's product page describes manual electrical connection followed by automatic testing, a pass/fail judgment and recording. So the test sequence runs by itself, while loading, connector insertion and unloading are done by people. For an unattended line, ask for a separate proposal covering those handling steps.

The basic test list covers open-circuit voltage, AC and DC internal resistance, charge activation, charging and discharging checks, and overcurrent-protection checks. The software lets you edit the step order and parameters. Send your actual release sequence, showing when activation happens and which checks need a response from the pack protection system.

Charging and discharging have different voltage ranges. Charging covers 0–300 V and discharging covers 20–300 V. That lower discharge limit matters if your sequence takes the pack lower. The catalogue also offers several charge-current and discharge-current options, and the biggest figure in one column does not come paired with the biggest in the other. Get your selected current and power configuration in writing.

The page specifies four-wire voltage and current sampling and CSV records, with test start by barcode or foot switch. Ask for the measurement uncertainty, the contact reliability you can expect and how records will reach your quality database. Request a sample record and a trial on your own pack fixture.

BMS communication and MES connection appear as options to confirm in advance. The page names several possible communication interfaces and says one protocol is supported by default, chosen to suit the customer's battery. Treat the protocol as a choice you make at order. Message definitions, scaling, response time and who does the integration all need to be agreed.

Original parameter values · 4 entries
ParameterPublished valueRecord status
Voltage0..300 Vknown
Recorded dataTest records with CSV export known
Measurement interfaceFour-wire known
Test modesOCV, ACIR, DCIR, charge/discharge and overcurrent protection known

Catalogue values apply to the configuration and test method the maker states. Ask for the values that apply to your configuration.

Source references: s2

BUYER NOTES

Match each check to an instrument

Dianzhonghe's catalogue lists a separate PACK and module EOL family and protection-board testers next to the DC comprehensive testers. Begin with a test matrix showing every check this pack needs. If you need insulation, withstand-voltage, protection-board testing or a separate aging step, ask which instrument and configuration covers each one. Count only the checks Dianzhonghe lists as DC-300V functions as part of this machine.

The DC-300V option table marks BMS communication, MES connection and printing as supported options to confirm. NTC testing, ID-resistor testing and a second charge/discharge path are marked unsupported in the same table. If you need one of those, ask the supplier for a written alternative proposal. The table covers this reference model; custom builds may differ.

Buying guidance from BatteryEquip.

BUYER NOTES

From connection to release

Settle how the pack identifier gets into the test record and how the operator makes the connection. Dianzhonghe supports manual wiring and test start by barcode or foot switch. For your fixture, define the terminal geometry, polarity protection, contact checking and what the station does when a barcode will not scan. These are points to price; no fixture comes in the catalogue.

Give Dianzhonghe a step list with the voltage and current conditions and the pass limits. Keep activation, resistance measurement, charging, discharging and protection checks as separate steps. Ask which steps can be shown on your pack and how the system handles an abnormal stop. Different BMS designs and pack builds may each need their own recipe.

Ask for a CSV example tied to the pack identifier and check it holds the fields your quality record needs. If you buy MES transfer, have the network cut during the demonstration and agree whether a pack may be released before the upload is acknowledged. The local result, barcode history and external upload happen separately, and the quotation should name who is responsible for each.

Buying guidance from BatteryEquip.

BUYER NOTES

What to request before choosing it for release testing

Dianzhonghe's company and product pages are the sources here. The product page describes reverse-polarity protection and a disconnect on emergency stop or on unexpected loss of AC input. Ask to see the safety design of the quoted unit and test its response once it is installed at your site.

The catalogue gives accuracy using its own full-scale and other abbreviations. Ask Dianzhonghe to explain each term, state the measurement range you will use and provide traceable calibration documents for the quoted configuration.

Ask the company for its business licence to confirm the legal entity, and for the current scope of any certificates it holds.

Buying guidance from BatteryEquip.

BUYER NOTES

When the DC-300V fits

Put the DC-300V on a shortlist when an assembled pack needs an operator-connected electrical inspection station with editable test steps and records tied to each product. It gives you a concrete model to discuss pack voltage, charge/discharge configuration and optional BMS or MES links. That keeps the purchase focused on the release test.

Look elsewhere if the job is mainly continuous cell cycling or automatic material handling, or if you need functions marked unsupported in the option table. Plan discharge work inside the 20–300 V range, since the 0–300 V figure applies to charging. When comparing quotes for full EOL coverage, assign each required test to a named instrument first, then compare prices.

Buying guidance from BatteryEquip.

BUYER NOTES

What to send with your enquiry

Pack and connection drawing: give the pack voltage window, terminal layout, intended connection method and the variants that need a fixture change.

Release-test matrix: list each electrical check, its order and its pass/fail rule. Flag insulation, protection-board or other checks that may need another instrument.

Power and current configuration: ask for the exact charge and discharge current and power options, and state the lowest discharge voltage your test needs.

BMS and data transfer: supply the protocol and message definitions and the CSV or MES fields you want. Ask who builds the interface and how a failed upload affects pack release.

Buying guidance from BatteryEquip.

BUYER NOTES

Make the record explain an interrupted test

Before the demonstration, agree the pack's state of charge, its protection state and the activation sequence allowed. Run your charge and discharge steps on the quoted configuration. Save the step settings with the CSV output so anyone checking later can see which limits led to the result.

Build a planned interruption into the test plan. See whether the record tells apart an unfinished run, a protection response and a limit failure, and how a retest links to the first result. Check the real discharge endpoint against the published 20 V lower limit. Look for a record of every step, since a pass label alone may hide one that never finished.

Source references: s2

MAKE A SELECTION

Questions that change the purchase

DecisionWhat the catalogue saysNext step
Which pack endpoint is needed?The page lists 0–300 V for charging and 20–300 V for discharging.Send your pack voltage window and ask for a step-by-step configuration check.
Is automated handling included?The page describes manual connection followed by automatic inspection.Specify fixtures, connection labour and the release record you need.
CLEAR UP THE DETAIL

Equipment questions

Does ‘automatic testing’ mean automatic pack loading?

No. The product page describes manual wiring followed by an automatic test sequence. An unattended station needs its own handling and fixture proposal, including connection checking and removal of rejected packs.

Source s2
Are BMS communication and MES upload included as standard?

They sit in the options table, and Dianzhonghe asks buyers to confirm options in advance. Put the chosen protocol, message definitions and MES interface in the quotation. Software that can upload data still needs an agreed price and integration scope.

Source s2
Can the tester discharge a pack down to zero volts?

The model lists a 20–300 V discharge range, separate from its 0–300 V charging range. If your sequence needs to discharge below 20 V, ask for a suitable alternative.

Source s2
FROM READING TO A BRIEF

Prepare the supplier conversation

Fill in the conditions below and ask the supplier to answer each open point in writing. Copying or downloading stays in your browser; nothing is sent.

Prepare a full project brief →

SOURCES

Sources and check dates

The maker's own pages and public records used for this page, each with the date it was checked.

s1 · Company and supply-scope record

Shenzhen Dianzhonghe New Energy Equipment Co., Ltd. · Manufacturer-origin source

The company page describing Dianzhonghe's battery-testing business and services.

Archived source check: 2026-10-07

s2 · DC-300V Battery Pack Comprehensive Tester

Shenzhen Dianzhonghe New Energy Equipment Co., Ltd. · Manufacturer-origin source

The product page giving the DC-300V test steps, charge and discharge ranges, sampling method and options.

Archived source check: 2026-09-26

s3 · Official portfolio context

Shenzhen Dianzhonghe New Energy Equipment Co., Ltd. · Manufacturer-origin source

Dianzhonghe's catalogue of other testers, useful when a check falls outside the DC-300V.

Archived source check: 2026-10-07

Still to confirm

  • The registered legal entity and its current certificates.
  • The charge and discharge current and power configuration in your quote.
  • The BMS protocol and message map supported for your pack.
  • Which loading and connection steps are manual in the quoted station.
  • Traceable calibration documents for the measurement ranges you will use.
BEFORE YOU REQUEST A QUOTE

Battery pack electrical inspection

  1. Pack voltage window
  2. Required release-test steps
  3. BMS protocol and firmware
  4. Fixture and MES interface scope
Edit your enquiryRead the manufacturer dossier →
Analytics preferences

Usage analytics loads only with your consent. Private pages are excluded. Inquiry text and contact details are not sent to analytics.

Analytics has not been allowed.