Battery module and PACK end-of-line tester

HYNN's end-of-line tester checks battery modules and packs for insulation resistance, withstand voltage, total voltage, AC resistance, DCIR, BMS and relay functions, cell-voltage consistency and temperature. Results bind to a barcode, with several CAN interfaces, role permissions and MES upload.

By HYNN

BatteryEquip editorial teamSource review: 2026-10-07Buying guide based on the maker's published data.
PUBLISHED REFERENCE

Test functions and data handling

HYNN's page lists insulation resistance, withstand voltage, total voltage, AC resistance, DCIR, BMS and relay functions, cell-voltage consistency and temperature acquisition. A one- or two-dimensional barcode starts each test and the result is bound to it. The tester has several CAN interfaces, user-role permissions and uploads test data to MES.

The page gives no voltage, current or range table for a fixed model. Ask which tests your configuration performs, which external instruments it connects to and how the fixture attaches to the module or PACK. Ask separately for the test accuracy on each range and for proof that it works with your BMS protocol.

Original parameter values · 3 entries
ParameterPublished valueRecord status
TraceabilityOne-dimensional and two-dimensional barcode initiation with result binding known
CommunicationMultiple CAN interfaces and host data storage known
Manufacturing integrationTest-data upload to MES known

Catalogue values apply to the configuration and test method the maker states. Ask for the values that apply to your configuration.

Source references: s2

BUYER NOTES

Make the pass or fail decision and the data handover visible

Send your test sequence, limits, BMS messages, product variants and the result fields you need. Ask for a sample record showing product identity, software and recipe version, measurements and the final decision. Agree how a failed or interrupted test is marked so it can never look like a completed pass.

Have HYNN show the handover from host computer to MES, including a communication loss and a duplicate barcode. In your enquiry, keep instrument acceptance apart from line takt, because fixture connection, linked tests and operator actions often set the real station cycle.

Buying guidance from BatteryEquip.

BUYER NOTES

Keep release testing apart from assembly

Treat this machine as an end-of-line test package, even though the supplier also offers PACK assembly. Ask which pack design, test functions and interfaces are in the quoted configuration. Finishing the assembly and producing a documented electrical release are two different deliverables, so name the station responsible for each result.

Use an agreed sample dataset and a representative pack to check barcode binding, result retrieval and the handling of missing records. Agree who authorises a retest and how the earlier failed result stays visible after a passing repeat. Ask for the equipment and software versions together with an exported release record. HYNN's company-wide delivery totals do not answer any of these points; these checks qualify the EOL package itself.

Buying guidance from BatteryEquip.

MAKE A SELECTION

Questions that change the purchase

DecisionWhat the catalogue saysNext step
Which EOL tests are supplied?The page lists test functions but no fixed station set or range table.Ask for the exact test functions, fixtures and interface limits.
Can the release record keep retest history?The page lists barcode binding and data upload without describing retests.Have HYNN show failed-result history, retest approval and exported records.
CLEAR UP THE DETAIL

Equipment questions

Does MES upload prove plant compatibility?

No. MES upload is a listed function. Test the field map, protocol, acknowledgement and recovery with your own MES.

Source s2
Does the name-change notice cover current certificates?

No. It records a dated change of company name. Ask for current documents for the company and for the quoted machine.

Source s4
FROM READING TO A BRIEF

Prepare the supplier conversation

Fill in the conditions below and ask the supplier to answer each open point in writing. Copying or downloading stays in your browser; nothing is sent.

Prepare a full project brief →

SOURCES

Sources and check dates

The maker's own pages and public records used for this page, each with the date it was checked.

s1 · Company and supply-scope record

HYNN · Manufacturer-origin source

HYNN's company overview of its production and test lines.

Archived source check: 2026-10-07

s2 · Battery module and PACK end-of-line tester

HYNN · Manufacturer-origin source

The product page listing the EOL test functions, barcode start, CAN interfaces and MES upload.

Archived source check: 2026-10-07

s3 · Official portfolio context

HYNN · Manufacturer-origin source

HYNN's other equipment, including PACK assembly and formation systems.

Archived source check: 2026-10-07

s4 · 2023 Guangdong enterprise name-change notice

Guangdong science and technology department · Public original record

A government notice linking HYNN's former and current company names.

Archived source check: 2026-10-07

Read original record →

Still to confirm

  • The voltage and current ranges, accuracy and test functions of the quoted configuration.
  • Compatibility with your BMS protocol and messages.
  • How a retest is authorised and how the earlier failed result stays on record.
  • The MES field map and recovery after a communication loss.
BEFORE YOU REQUEST A QUOTE

Module and pack release testing with barcode records

  1. Pack design and test programme
  2. EOL functions and fixture scope
  3. Serial-number and result schema
  4. Retest and missing-data handling
Edit your enquiryRead the manufacturer dossier →
Analytics preferences

Usage analytics loads only with your consent. Private pages are excluded. Inquiry text and contact details are not sent to analytics.

Analytics has not been allowed.